totaldemolition-shapedivider-2@1x

GMFRS – CREWE FIRE STATION

Back to Projects

Project Details.

The demolition and asbestos removal at Crewe Fire Station is a critical project involving the safe and controlled dismantling of..

Read more

Project Duration

.

0

Weeks

0

Days

Location

CREWE

Status

Completed

January 2023

Project Value

£70K

Recycling Rate

0%

Number of Site Staff

0

Services.

A range of services performed, reflecting Total Demolition's diverse capabilities and comprehensive solutions.
Asbestos| Crushing and Recycling| Demolition| Earth Works

Key Challenges & Solutions.

Key Objectives:

  1. Safe Asbestos Removal: Ensure the safe and thorough removal of all asbestos-containing materials from the site, minimizing the risk of exposure to workers and the public.
  2. Controlled Demolition: Execute the demolition of the Crewe Fire Station in a controlled manner, preventing any unintended damage to surrounding structures or utilities.
  3. Compliance with Regulations: Adhere strictly to all health, safety, and environmental regulations, ensuring full compliance with legal and industry standards.
  4. Minimal Disruption: Complete the project within the stipulated timeline with minimal disruption to ongoing emergency services and the local community.
  5. Quality of Service: Maintain the highest standards of workmanship and safety throughout the project, ensuring all work is completed to specification.

Scope of Work:

  1. Pre-Demolition Survey & Planning:
    • Conduct a thorough asbestos survey to identify the location and extent of all ACMs within the building.
    • Develop a detailed asbestos removal plan, incorporating risk assessments, control measures, and disposal routes.
    • Create a comprehensive demolition plan, outlining the sequence of operations, equipment to be used, and safety precautions.
  2. Asbestos Removal:
    • Set up regulated work areas with appropriate containment, negative pressure units, and decontamination facilities.
    • Carefully remove all identified ACMs, ensuring no contamination of the environment or exposure to workers.
    • Transport and dispose of asbestos waste at licensed facilities, providing all necessary documentation and clearance certificates.
  3. Demolition:
    • Disconnect and safely isolate all utilities (electricity, water, gas) before commencing demolition.
    • Use controlled demolition techniques to systematically dismantle the structure, including high-reach excavators and hand demolition where required.
    • Manage debris and waste with a focus on recycling and responsible disposal, minimizing environmental impact.
  4. Site Clearance & Remediation:
    • Clear the site of all demolition debris, ensuring all hazardous materials are safely removed.
    • Conduct soil testing and site remediation as necessary, preparing the site for future use.
    • Finalize documentation, including waste transfer notes and completion reports, for client and regulatory review.

Key Challenges & Solutions:

  1. Tight Programme:
    • Challenge: The project must be completed within a strict timeframe to avoid delays in the construction of the new fire station and minimize disruption to local services.
    • Solution: Implement a fast-track programme with overlapping work phases where possible. Utilize advanced project management software to track progress and allocate resources efficiently. Maintain close communication with all stakeholders to quickly resolve any issues that arise.
  2. Ensuring Safety:
    • Challenge: The presence of asbestos and the need for controlled demolition in a potentially hazardous environment pose significant safety risks.
    • Solution: Engage a specialized asbestos removal contractor with proven experience. Enforce stringent safety protocols, including personal protective equipment (PPE), regular site inspections, and air monitoring. Provide comprehensive training for all personnel on-site to ensure they understand the risks and safety procedures.
  3. Quality of Service:
    • Challenge: Maintaining high standards of workmanship and ensuring no shortcuts are taken, despite the project’s tight schedule.
    • Solution: Implement a robust quality assurance (QA) programme with regular inspections and audits. Ensure all materials and methods meet industry standards. Establish clear communication channels to quickly address any quality concerns that arise during the project.

The demolition and asbestos removal at Crewe Fire Station is a complex project that requires meticulous planning, expert execution, and rigorous adherence to safety and quality standards. By focusing on these key objectives and employing targeted solutions, the project aims to deliver a successful outcome that allows for the timely construction of the new fire station, with minimal disruption to the community and utmost respect for safety and environmental standards

Similar Projects.

totaldemolition-shapedivider-2@1x
totaldemolition-icon-map-red

Discover total.

Explore our range of solutions designed to meet the diverse needs of our clients, from precision dismantling to environmentally conscious asset recovery.

Talk to us about your next project

Contact Tom Jones

Transport Consultant

Close

Google reCaptcha: Invalid site key.

Contact Lee Mallalieu

Workshop & Yard Manager

Close

Google reCaptcha: Invalid site key.

Contact Anthony Chadderton

Plant & Hire Manager

Close

Google reCaptcha: Invalid site key.

Contact Leanne Corkery

Business Development, Media & Marketing Manager

Close

Google reCaptcha: Invalid site key.

Contact Harrison Quinn

Contracts Manager

Close

Google reCaptcha: Invalid site key.

Contact Martin Nelson

Health & Safety Advisor – Rail

Close

Google reCaptcha: Invalid site key.

Contact Michael Quinn

Development & Compliance Manager

Close

Google reCaptcha: Invalid site key.

Contact Philip Smith

Commercial Manager

Close

Google reCaptcha: Invalid site key.

Contact Andrew Corkery

Projects Director

Close

Google reCaptcha: Invalid site key.

Contact Lee Brash

Managing Director

Close

Google reCaptcha: Invalid site key.

Project Details

.

Close

The demolition and asbestos removal at Crewe Fire Station is a critical project involving the safe and controlled dismantling of the existing fire station structure, which has served the community for several decades. The project also entails the careful identification, removal, and disposal of asbestos-containing materials (ACMs) present within the building. Given the sensitive nature of the site and the hazardous materials involved, the project will be carried out under stringent safety and quality control measures, adhering to all relevant regulations and industry best practices.

The project is bound by a tight schedule to minimize disruption to emergency services and the surrounding community, requiring precise coordination and efficient execution.