totaldemolition-shapedivider-2@1x

ICON 3 REDEVELOPMENT

Back to Projects

Project Details.

TOTAL Controlled Demolition Services Limited successfully executed an asset recovery and careful internal soft strip project at ICON 3 in..

Read more

Project Duration

.

0

Weeks

0

Days

Location

ALTRINCHAM

Status

Completed

March 2024

Project Value

£95K

Recycling Rate

0%

Number of Site Staff

0

Services.

A range of services performed, reflecting Total Demolition's diverse capabilities and comprehensive solutions.
Asset Recovery| Soft Strip Works

Key Challenges & Solutions.

This project involves the internal soft strip and asset recovery of the ICON 3 Warehouse located in Altrincham. The warehouse, previously used for storage and distribution, is being prepared for either refurbishment or redevelopment. The soft strip process involves the removal of non-structural elements such as fixtures, fittings, and internal partitions, while asset recovery focuses on salvaging valuable materials, equipment, and components for reuse or resale. The primary objectives are to carry out the soft strip efficiently, maximize asset recovery, and prepare the warehouse for its next phase without compromising safety or environmental standards.

Key Objectives:

  1. Efficient Soft Strip: Execute the removal of all non-structural elements in a systematic and efficient manner, ensuring the warehouse is clear for future use.
  2. Maximize Asset Recovery: Identify, salvage, and preserve valuable assets, including machinery, fixtures, and recyclable materials, to maximize their resale or reuse value.
  3. Safety Compliance: Ensure the safety of all personnel involved in the project by adhering to strict safety protocols and guidelines.
  4. Environmental Management: Handle all waste and materials in an environmentally responsible manner, prioritizing recycling and proper disposal of hazardous substances.
  5. Timely Completion: Complete the project within the specified timeline to align with broader redevelopment or refurbishment schedules.

Key Challenges:

  1. Identification and Cataloging of Assets:
    • Challenge: The warehouse contains a variety of assets, ranging from office furniture to industrial equipment, which need to be accurately identified, cataloged, and valued for recovery.
    • Solution: Conduct a detailed pre-strip audit and inventory of all assets within the warehouse. Use asset tagging and cataloging software to track items systematically. Engage specialists to assess the value and potential resale markets for different categories of assets.
  2. Safe Removal of Non-Structural Elements:
    • Challenge: The removal of internal fixtures, fittings, and partitions must be carried out without damaging the structural integrity of the warehouse or posing safety risks to workers.
    • Solution: Develop a phased soft strip plan that begins with non-critical areas and progresses to more complex sections. Ensure all workers are trained in safe removal techniques and are equipped with the necessary tools and personal protective equipment (PPE). Conduct regular safety briefings and risk assessments throughout the project.
  3. Handling and Disposal of Hazardous Materials:
    • Challenge: The warehouse may contain hazardous materials, such as asbestos, old electrical wiring, or chemicals, which require careful handling and disposal.
    • Solution: Conduct a hazardous material survey before beginning the strip-out process. Engage licensed specialists for the removal and disposal of hazardous substances, ensuring compliance with all relevant environmental regulations. Implement strict waste management protocols to segregate and dispose of hazardous and non-hazardous materials safely.
  4. Maximizing Reuse and Recycling of Materials:
    • Challenge: A significant portion of the materials removed during the soft strip could potentially be recycled or reused, but this requires careful sorting and handling.
    • Solution: Establish on-site sorting areas to separate materials such as metal, wood, and plastics for recycling. Partner with local recycling facilities and salvage companies to process and resell recovered materials. Track and document the recycling process to meet sustainability goals and regulatory requirements.
  5. Minimizing Disruption to Adjacent Operations:
    • Challenge: If the ICON 3 Warehouse is part of a larger operational complex, there may be ongoing activities in adjacent buildings that could be disrupted by the soft strip process.
    • Solution: Coordinate with facility management to schedule soft strip activities during off-peak hours or periods of minimal activity. Implement noise and dust control measures, such as using low-noise equipment and dust suppression systems, to minimize the impact on neighboring operations.
  6. Logistical Coordination and Waste Management:
    • Challenge: The project will generate a significant amount of waste and recovered materials that need to be transported off-site for disposal, recycling, or resale.
    • Solution: Develop a detailed logistics plan that includes waste segregation, on-site storage, and scheduled transport to recycling and disposal facilities. Use tracked vehicles and waste manifests to ensure accountability and compliance with waste disposal regulations. If feasible, explore on-site recycling options to reduce transportation needs.
  7. Meeting Project Timeline and Budget:
    • Challenge: The soft strip and asset recovery process must be completed within a tight schedule to align with the broader redevelopment or refurbishment plans, while also adhering to budget constraints.
    • Solution: Establish a detailed project timeline with clear milestones and deliverables. Monitor progress regularly against the schedule and adjust resources as needed to stay on track. Implement cost-control measures, such as bulk recycling contracts or asset sale agreements, to manage the budget effectively.
  8. Stakeholder Communication and Coordination:
    • Challenge: Multiple stakeholders, including the building owner, contractors, and possibly future tenants, need to be kept informed of the project’s progress and any potential impacts.
    • Solution: Develop a stakeholder communication plan that includes regular updates, meetings, and reports. Assign a project manager to act as the primary point of contact for all stakeholders, ensuring that any concerns are addressed promptly and transparently.

Similar Projects.

totaldemolition-shapedivider-2@1x
totaldemolition-icon-map-red

Discover total.

Explore our range of solutions designed to meet the diverse needs of our clients, from precision dismantling to environmentally conscious asset recovery.

Talk to us about your next project

Contact Tom Jones

Transport Consultant

Close

Google reCaptcha: Invalid site key.

Contact Lee Mallalieu

Workshop & Yard Manager

Close

Google reCaptcha: Invalid site key.

Contact Anthony Chadderton

Plant & Hire Manager

Close

Google reCaptcha: Invalid site key.

Contact Leanne Corkery

Business Development, Media & Marketing Manager

Close

Google reCaptcha: Invalid site key.

Contact Harrison Quinn

Contracts Manager

Close

Google reCaptcha: Invalid site key.

Contact Martin Nelson

Health & Safety Advisor – Rail

Close

Google reCaptcha: Invalid site key.

Contact Michael Quinn

Development & Compliance Manager

Close

Google reCaptcha: Invalid site key.

Contact Philip Smith

Commercial Manager

Close

Google reCaptcha: Invalid site key.

Contact Andrew Corkery

Projects Director

Close

Google reCaptcha: Invalid site key.

Contact Lee Brash

Managing Director

Close

Google reCaptcha: Invalid site key.

Project Details

.

Close

TOTAL Controlled Demolition Services Limited successfully executed an asset recovery and careful internal soft strip project at ICON 3 in Altrincham. This project aimed to recover valuable assets and systematically remove non-structural elements within the building, preparing it for subsequent redevelopment or renovation while maximizing the reuse of materials.