Project Details.
The India Building in Liverpool, a Grade II listed structure, is undergoing significant internal refurbishment to accommodate new tenants, Her..
Project Duration
.
Weeks
Days
Location
LIVERPOOL
Status
Completed
November 2022
Project Value
£2.8M
Recycling Rate
Number of Site Staff
Services.
Key Challenges & Solutions.
1. Historical Preservation Constraints:
- Challenge: The India Building is Grade II listed, meaning any work must comply with stringent regulations to preserve its historical and architectural value. Any alteration or removal of original features could impact the building's heritage status.
- Solution: Collaborate closely with conservation officers and heritage consultants to develop a work plan that aligns with the requirements for listed buildings. Detailed surveys and documentation of all historical features were conducted before work commenced. During the soft strip and ceiling removal, only non-structural, non-original elements will be removed. Original features, such as cornices, mouldings, and other architectural details, will be protected and retained.
2. Failed Ceiling Removal:
- Challenge: The building has suffered from failed ceiling structures that present both safety risks and challenges in removal due to their potential impact on surrounding features and overall building integrity.
- Solution: A comprehensive structural assessment was conducted to understand the condition and extent of the failed ceilings. A step-by-step removal plan was devised, starting with areas where the ceilings pose the highest risk. Controlled removal techniques will be used to prevent debris from causing damage to adjacent structures. Temporary supports and protective coverings will be employed to safeguard the integrity of both the building and any workers involved.
3. Soft Strip in a Listed Building:
- Challenge: The soft strip process in a listed building requires a delicate balance between removing modern installations and preserving historical elements.
- Solution: The soft strip operation will be meticulously planned to differentiate between modern additions that can be removed and original features that must be preserved. Skilled workers experienced in working with listed buildings will carefully remove partitions, non-original ceilings, fixtures, and finishes. Continuous monitoring and supervision will ensure that no historical fabric is inadvertently damaged.
4. Logistics and Site Management in a Central Location:
- Challenge: The India Building is located in a busy, central area of Liverpool, making logistics and site management challenging, particularly in terms of access, waste removal, and minimizing disruption to nearby businesses.
- Solution: A detailed logistics plan will be implemented, including restricted working hours to avoid peak times, designated loading zones, and off-site waste sorting to minimize on-site activity. Regular communication with local authorities and stakeholders will ensure smooth operations and reduce the impact on surrounding areas. Additionally, noise and dust suppression measures will be in place to minimize disruption.
5. Health and Safety Compliance:
- Challenge: The removal of failed ceilings and internal soft strip operations pose significant health and safety risks, including exposure to hazardous materials, potential structural instability, and risks associated with working at height.
- Solution: A comprehensive health and safety plan will be developed, with risk assessments conducted for all activities. All personnel will receive appropriate training, and personal protective equipment (PPE) will be mandatory. Scaffolding, hoists, and other safety equipment will be employed to ensure safe working conditions, particularly in areas requiring the removal of high or unstable ceilings. Regular safety audits will be carried out to ensure ongoing compliance.
Project Phases:
- Pre-Construction Planning:
- Historical and structural surveys.
- Development of conservation-compliant work plans.
- Detailed logistics and safety planning.
- Initial Soft Strip:
- Removal of non-original partitions, fixtures, and finishes.
- Protection and preservation of original features.
- Failed Ceiling Removal:
- Structural assessment and installation of temporary supports.
- Controlled removal of failed ceiling materials.
- Final Soft Strip and Clean-Up:
- Completion of soft strip, ensuring all non-historical elements are removed.
- Site clean-up and preparation for occupation by HMRC.
The internal soft strip and ceiling removal works at the India Building in Liverpool present significant challenges due to the building's Grade II listed status and the complex nature of the tasks involved. By adopting a methodical, conservation-focused approach, TOTAL Controlled Demolition Services Limited is committed to preserving the building's historical integrity while safely and efficiently preparing the site for its new tenants. This project not only demonstrates our expertise in handling delicate and high-stakes demolition works but also our commitment to safeguarding the heritage of one of Liverpool's most iconic structures.